Skip to main content
Construction

Concrete Calculator

Estimate how much concrete you need for a slab, footing or column in cubic yards and cubic feet, plus the number of bags required.

Pour details

A 5–10% waste allowance covers spillage, uneven subgrade and minor over-excavation. Bag yields are approximate and vary by mix.

Concrete needed

Concrete volume

1.3 yd³

About 59 × 80 lb bags

Cubic feet (with waste)
35 ft³
Cubic yards
1.296 yd³
Cubic meters
0.991 m³
Bags needed
59 bags
Approx. weight
5,250 lb
Bag yield used
0.6 ft³ / bag

How to use the Concrete calculator

  1. 1

    Choose a slab, round column or square column.

  2. 2

    Enter the dimensions in feet and inches as labelled.

  3. 3

    Add a waste allowance and pick your bag size to see cubic yards and the number of bags.

Frequently asked questions

How many cubic feet are in a cubic yard of concrete?

One cubic yard equals 27 cubic feet. Concrete is usually ordered in cubic yards, while bag yields are listed in cubic feet per bag.

How much does a bag of concrete cover?

An 80 lb bag yields about 0.60 cubic feet, a 60 lb bag about 0.45 cubic feet, a 50 lb bag about 0.375 cubic feet and a 40 lb bag about 0.30 cubic feet. Actual yield varies by mix and water added.

How much waste should I allow?

A 5–10% allowance is typical for slabs and footings. It covers spillage, uneven subgrade and small measurement errors. Ordering slightly more is cheaper than running short mid-pour.